Townhouse, Mira Oasis

Four wet rooms rebuilt, 72 m² of wall tiling.

Community
Mira Oasis
Type
Townhouse, ground and first floor
Works
Full villa renovation
Completed
December 2025
Role
Managed by Olea Sol

The brief

A two-storey townhouse renovated throughout. Floors were lifted and re-laid, the staircase and balcony re-tiled, three bathrooms and a powder room rebuilt, and the wiring renewed for smart-home control.

Delivered under another company's contract, with the Olea Sol team managing the works.

  • Floors lifted, re-screeded and re-tiled throughout; staircase and balcony re-tiled
  • Gypsum ceilings with shadow gap; plaster and paint
  • Three bathrooms and a powder room rebuilt: waterproofing, tiling, built-in WCs, LED mirrors
  • Electrical rework, smart-home wiring, feature and track lighting
  • Outside: stone tiling and bollard lighting

The same room 03 rooms

What changed, room by room.

The stair.

The old floor came up to the slab. The stair was re-tiled, with a patterned riser on every step.

Ground floor, the stair hall.

The hall.

The hall beside the stair: the old floor lifted and the walls prepared, then re-laid, plastered and painted.

Ground floor, the hall beside the stair.

The arches.

Two square openings to the kitchen and pantry, formed into arches, then plastered and painted.

Ground floor, looking to the kitchen.

  1. Strip-outFloor lifted to the slab.
  2. WorksPatterned risers going on.
  3. HandoverStaircase re-tiled, wall lit.
  4. Strip-outFloor lifted, walls prepared.
  5. WorksNew screed, the stair wrapped.
  6. HandoverRe-laid, plastered, painted.
  7. Strip-outTwo square openings.
  8. HandoverFormed into arches, plastered, painted and lit.
01

Pick a room, then scroll, drag the marker or use the arrow keys.

The stair

The old floor came up to the slab. The stair was re-tiled, with a patterned riser on every step.

Stair hall with the old floor lifted down to the slab
Strip-out / Mira Oasis

Floor lifted to the slab.

Patterned tile risers being set on the bottom steps of the staircase
Works / Mira Oasis

Patterned risers going on.

Staircase re-tiled with patterned risers beside a lit wall
Handover / Mira Oasis

Staircase re-tiled, wall lit.

The hall

The hall beside the stair: the old floor lifted and the walls prepared, then re-laid, plastered and painted.

The same hall before, with the old floor lifted and the walls being prepared
Strip-out / Mira Oasis

Floor lifted, walls prepared.

The hall beside the staircase during the works: new screed floor, the stair wrapped in protection, the window at the end
Works / Mira Oasis

New screed, the stair wrapped.

Hall beside the staircase after the renovation, looking to the window
Handover / Mira Oasis

Re-laid, plastered, painted.

The arches

Two square openings to the kitchen and pantry, formed into arches, then plastered and painted.

The two square openings to the pantry and kitchen during strip-out, before they were formed into arches, with broken tiles on the floor
Strip-out / Mira Oasis

Two square openings.

Kitchen seen through an arched opening with pendant lights
Handover / Mira Oasis

Formed into arches, plastered, painted and lit.

Site diary 09

Stage by stage.

  1. Strip-out

    01 / 09

    Living room of a Mira Oasis townhouse at strip-out: old finishes removed, scaffold up, outside doors beyond

    The old finishes come off across the ground floor.

  2. Strip-out

    02 / 09

    A bathroom stripped back to the blockwork, old tiles and fittings removed

    The bathrooms go back to the blockwork, ready for waterproofing.

  3. Works

    03 / 09

    New floor tile laid in the hall, spacers still in the joints

    New floor tile going down, spacers still in the joints.

  4. Works

    04 / 09

    Botanical-pattern feature tile going up on the shower wall, ceiling still open

    Feature tile going up in a shower, the ceiling still open.

  5. Works

    05 / 09

    The living room window wall during the works: the rounded wall panel formed in plaster between the two windows, before its light was fitted

    The wall panel between the windows formed in plaster, ready for its light.

  6. Works

    06 / 09

    Gypsum ceiling with a shadow gap and slot diffusers being boarded

    Gypsum ceilings boarded, with a shadow gap and slot diffusers.

  7. Works

    07 / 09

    The feature tile wall finished before the fittings, ceiling access still open

    The feature wall finished, waiting for its fittings.

  8. Works

    08 / 09

    The living room near the end of the works, looking to the media wall under protection, with the new floor laid and the slot diffusers in the ceiling

    Near the end: the new floor down, the media wall under protection.

  9. Handover

    09 / 09

    Vanity with a backlit round mirror and integrated basin

    Handover: cleaned and lit.

Shower in book-matched stone-look tile with a niche and linear drain

The detail

The shower wall.

Every wet room went the same way: waterproofing first, then tiling. In the main shower the stone-look tile is laid book-matched, so the veins mirror across the joint and read as one slab, with a niche in the wall and a single linear drain in the floor. In the second shower, a botanical-pattern feature tile is laid the full height of the wall.

Shower wall in a botanical-pattern feature tile beside a wall-hung WC

At handover 01

The finished rooms.

Living room with an arched opening and slot diffusers in the ceiling
01 Arched opening

Measured

The job in numbers.

of wall tiling in the wet rooms
72 m²
bathrooms and a powder room
3 + 1
bollard lights outside
11
of stone tiling outside
36 m²
Scope, measured
No.ItemQuantitySource
01Wet rooms rebuilt3 bathrooms and a powder roomPapers
02Wall tiling, wet rooms72 m²Papers
03Balcony tiling12 m²Papers
04Stair treads and risers9 m² and 4.2 m²Papers
05Stair railing refixed10 lmPapers
06Stone tiling outside36 m²Papers
07Bollard lights11Papers
08Switches and sockets40 replaced, 20 newPapers
09Ceiling fans2Papers

Quantities as stated on the job's own papers, or read from its photographs where marked. We never publish prices.